1. Home
  2. Tools
  3. Peak support staffing

How many agents do you need for peak tickets?

Black Friday and the January returns wave both swell the inbox. Enter tickets per day, handle time and productive hours from your own helpdesk — not a benchmark — to see the seat count and the gap if you stay at today’s headcount.

Some links may earn us a commission at no cost to you. Drafted with AI, checked by a human. How we earn.

  • Your own numbers
  • Every formula shown
  • Runs in your browser
Illustration of a support inbox and a staffing plan on a kraft desk

Your inbox figures

Examples, not benchmarks

Every default below is an example, not a staffing benchmark. Use a peak-day ticket count and the average handle time from your helpdesk report.

1Tickets and handle time
180 tickets/day
2Hours and shrinkage

Productive hours = scheduled hours × (1 − shrinkage). If your report already gives productive hours, set shrinkage to 0 and type those hours in the scheduled-hours field.

3Optional labour cost

How the math works

Ticket-hours per day = tickets × average handle time ÷ 60. Productive hours per agent = scheduled hours × (1 − shrinkage). Agents needed = ticket-hours ÷ productive hours. The gap is that seat count minus the agents you already have on the rota.

If you type an hourly cost, labour for the window is agents needed × productive hours × wage × days. That is a workload cost, not a quote from any helpdesk vendor.

This is not a service-level calculator: it does not model response-time targets or after-hours coverage unless you folded those into handle time or shrinkage. Checked 10 Nov 2026 (Asia/Kuala_Lumpur).

See Gorgias for helpdesk staffing at peak

FAQ

Is 25% shrinkage a standard contact-centre figure?

It is an example so the form is not empty. Use the shrinkage from your own workforce plan, or set it to 0 and enter productive hours directly.

Should I use average tickets or a peak day?

Use the day you actually have to staff for — often a Monday after Black Friday, or a mid-January returns day — not a quiet mid-week average.

Does this include chat, email and phone together?

Only if you put the combined ticket count and a blended handle time in the fields. Split the channels into separate runs if the handle times are very different.

Can I plan overtime instead of hiring?

If the calculator shows you are short, the overtime line is the productive hours per day your current team would have to absorb. Whether that is safe is a staffing judgement, not something this page decides.